Proper base preparation is essential for playground longevity and safety. Type 2 road base provides a stable foundation when properly installed and compacted. This calculator helps determine the volume needed for your project, accounting for the required 95% compaction rate.
Type 2 Road Base Calculator
Includes 95% compaction factor
This calculator includes: - 95% compaction factor automatically applied - Two calculation methods: dimensions or square footage - Depth selection from 1 to 14 inches - Clear visual feedback and error handling The calculation uses the formula: $$ \text{Cubic Yards} = \frac{\text{Square Feet} \times \text{Depth (inches)} \times \frac{1}{0.95}}{12 \text{ inches/ft} \times 27 \text{ cu ft/cu yd}} $$ Key features: - Automatic compaction factor adjustment - Input validation - Responsive design - Clear visual hierarchy - Professional styling - Informative notes about compaction - Results rounded to 2 decimal places The interface accounts for the 95% compaction by multiplying the volume by approximately 1.053 (1/0.95) to ensure enough material is ordered to achieve the desired compacted depth.
Installation Requirements
Minimum Specifications
- 4-inch minimum depth after compaction
- 95% compaction requirement
- Installation in 2-inch lifts
- Proper moisture content during compaction
- Grading for positive drainage
Compaction Guidelines
Each lift must be installed and compacted separately:
- Maximum 2-inch loose material per lift
- Maintain optimal moisture content
- Use appropriate compaction equipment
- Test compaction levels between lifts
- Achieve 95% compaction before next lift
Using the Calculator
The calculator accounts for:
- Required 95% compaction factor
- Area dimensions
- Specified depth
- Multiple lift requirements
Installation Process
Site Preparation
- Remove existing soil to proper depth
- Grade subgrade for drainage
- Install geotextile fabric if required
- Mark final grade elevations
Base Installation
- Spread material in 2-inch lifts
- Add water to achieve optimal moisture
- Compact each lift thoroughly
- Test compaction before proceeding
- Grade final lift to specified slope
Professional Tips
Material Handling
- Store material on hard, clean surface
- Protect from contamination
- Maintain consistent moisture
- Avoid segregation during placement
Quality Control
- Test material gradation
- Monitor moisture content
- Verify compaction rates
- Document test results
- Maintain consistent depth
Common Applications
- Equipment zones
- Access paths
- Border areas
- Transition zones
- Drainage areas
Important Considerations
Drainage Requirements
- Minimum 1% slope from center
- Proper perimeter drainage
- Surface water management
- Connection to existing systems
Weather Factors
- Avoid installation during rain
- Protect from freezing
- Maintain moisture in hot weather
- Allow for proper curing
The calculator above will help determine the exact amount of Type 2 road base needed for your project, factoring in compaction requirements and lift specifications to ensure a stable, long-lasting playground foundation